Save Money

Increase FSR

Future Proof Homes

Build More Homes Faster: Skip the Electrical Service Upgrades

Meet today’s green standards and prepare for tomorrow’s needs. The Energy Processor installs seamlessly, eliminates the need for costly pad-mounted transformers and service upgrades, and provides a future-ready hub for solar, batteries, and vehicle-to-grid that positions your projects as truly smart homes.

EV‑ready

Homes people want

Wait for service upgrades

0

Service Upgrade Avoidance

↓ $20,000 to $100,000 / site

Smarter Homes

Intelligent Electrification

Build More Homes Faster: Skip the Electrical Service Upgrades

Meet today’s green standards and prepare for tomorrow’s needs. The Energy Processor installs seamlessly, eliminates the need for costly pad-mounted transformers and service upgrades, and provides a future-ready hub for solar, batteries, and vehicle-to-grid that positions your projects as truly smart homes.

Save Money

Increase FSR

Future Proof Homes

Why It Works for You

EV‑ready

Homes people want

Wait for service upgrades

0

Service Upgrade Avoidance

↓ $20,000 to $100,000 / site

Smarter Homes

Intelligent Electrification

A catalyst for profitable builds

Three core elements that reduce build complexity, electrical costs ands enable seamless electrification

Future-Ready Infrastructure

Every home comes ready for EV charging, solar, and storage from day one with The Energy Processor acting as the central hub.

Reduced Infrastructure Costs

Cut project costs by eliminating the need for pad-mounted transformers and oversized 400–600A service connections. Free up site space for an extra outbuilding instead of a PMT

Faster occupancy

Avoid months of waiting for utility service upgrades or transformer approvals. Keep projects on schedule and deliver homes on time, without leaving buyers waiting for move-in.

Smart Power for Every Project

Solutions tailored for different types of real estate development

Single Family Home

Smart panels that future-proof every home with maximum flexibility.

Small MURBs / Multiplex

Optimized solutions for low-rise and infill projects (3–12 units).

Prefab/Modular Homes

Seamless power integration designed for modular construction.

Optimized workflow

A proven process that integrates seamlessly with your construction schedule

1- Design and planning

Detailed review of electrical loads, development of standard plans and preparation of specialized technical reports

1-2 weeks

Deliverables:

2 - Guided installation

Implementation with detailed material lists and step-by-step guidance for certified contractors.

1 day per unit

Deliverables:

3 - Commissioning

Comprehensive functional testing, safety verification, and documented delivery process.

2-4 hours per unit

Deliverables:

4 - Scaling

Continuous support in subsequent phases and batches with standard documentation and optimized processes.

Continuous support

Deliverables:

Specifications for work

Essential information for engineering, permitting, and on-site equipment.

Dimensions

Residential panel format; load variants

Feeding

Compatibility with residential standards

Installation

Guided assembly and QA/QC checklists

Security

Load limits and real-time coordination

DERs

Ready for EV, solar, batteries (integration patterns)

Measurement

Audit-friendly telemetry for deliveries

“We integrated FUTURi into our pilot project, and the results exceeded expectations. We reduced electrical rework by 60%, and delivery was flawless. Buyers highly appreciated the EV-ready home.”

Project Director

MFR Developer • 200+ units

Results of the pilot project

Reduction in electrical rework

60%

Average installation per unit

1 day

Buyer satisfaction

95%

Related post-sales calls

0

Additional benefits

Scroll to Top